Jorethang Loop Hydroelectric project

Power project in Sikkim

Dam in Sikkim, India
Jorethang Loop Hydroelectric project is located in Sikkim
Jorethang Loop Hydroelectric project
Location in Sikkim
Map
About OpenStreetMaps
Maps: terms of use
3km
2miles
Power House
Power House
Dam
Dam
27°9′36″N 88°17′31″E / 27.16000°N 88.29194°E / 27.16000; 88.29194Opening date26 September 2015Construction costRs. 1,182 croreOwner(s)Government of IndiaOperator(s)Sikkim Renewable Energy Development AgencyDam and spillwaysType of damConcrete GravityImpoundsRangit RiverHeight17 metres (56 ft)Length108 metres (354 ft)Spillway capacitym³/sReservoirSurface area14.489 hectares (35.80 acres)Power StationCommission date29 October 2015TypeRun-of-the-riverTurbines2×48 MWInstalled capacity96 MWAnnual generation444.03 GWh

Jorethang Loop Hydroelectric project is a 96 megawatts (129,000 hp), run-of-the-river hydroelectric power station on the Rangit river in South Sikkim district of Sikkim state in India.[1] The dam is located near village Piple and power station is located about 13 km downstream near village Majhitar. Dans Energy Private Limited was awarded contract for construction of the project. The project was officially inaugurated on 29 October 2015. The project was built at a cost of Rs 1,182 crores.[2][3][4]

Powerhouse

The dam is located about 5 km upstream from Jorethang and powerhouse is located about 13 km downstream from dam site at 27°06′29″N 88°19′27″E / 27.10806°N 88.32417°E / 27.10806; 88.32417 (Jorethang Loop HEP). Water is diverted from barrage through 6.8 km long head race tunnel, through a surge shaft of 25 m dia. and pressure shaft to power house near village Majitar. The powerhouse has 2 x 48.75 MW vertical shaft type Francis turbines that generate 2x48 MW power. The water flow is discharged back into Rangit river through a 40m tall race channel. With installed capacity is of 96 MW project is expected to generate approximately 444.03 GWh per annum.[1][5]

Power transmission

The electricity generated is connected to switchyard near powerhouse and evacuated through double circuit 220 kV transmission line to the New Melli 220KV switching substation. New Melli sub station is located about 10 km away from powerhouse and connected to Eastern Regional Grid.[1][6]

See also

  • iconWater portal
  • iconRenewable energy portal

References

  1. ^ a b c "Monitoring report - Jorethang Loop Hydroelectric Project, India". Clean Development Mechanism. Retrieved 15 January 2019.
  2. ^ "Jorethang Loop Hydro-Electric Power (Sikkim) Project". Retrieved 15 January 2019.
  3. ^ "96 Mw Jorethang Loop project commissioned". NE live. 30 October 2019. Retrieved 15 January 2019.
  4. ^ "Sikkim's second private HEP launched". United News of India (UNI). 24 September 2015. Retrieved 15 January 2019.
  5. ^ "Jorethang Loop Hydroelectric Project, India". United Nations Carbon offset platform. Retrieved 15 January 2019.
  6. ^ "Power Transmission system from Sikkim" (PDF). Ministry of Environment, Forest and Climate Change - Government of India. Retrieved 15 January 2019.

External links

  • Jorethang Loop HEP
  • v
  • t
  • e
Hydrography of Northeast India
Rivers
Lakes
Waterfalls
Major bridges
Power projects
Fluvial islands


Stub icon

This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e
Stub icon

This India-related article is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e
frontpage hit counter